Scope

 
The new addition includes several offices and adjacent workrooms as well as a much anticipated situation center designed with a large glazed curved window wall for monitoring of the client’s service yard. In an effort to relate to the existing facility, the building’s façade incorporates a decorative concrete masonry and brick veneer with a brick fascia/pilaster system mimicking the brickwork of the existing facility.

Key Facts

Location
Greer, South Carolina
Client/s
Greer CPW
Contractor
Clayton Construction
Project Type
Addition
Cost
$550,000