Scope

As a part of the Wastewater Treatment Plant Master Plan, Design South identified and recommended to Clemson University numerous upgrades to the existing facilities.  The implementation plan recommended projects to be phased in order to align with available funding.

Engineering services for Phase 1 include planning, preliminary design, final design and construction administration services.  To date, the following Phase 1 services have been performed.
Phase 1 Scope:

  • Evaluation of existing WWTP
  • Preparation of Preliminary Engineering Report
  • Construction of new Headworks to include Screening and Grit Collection 
  • Construction of new Influent Pump Station, electrical room and related appurtenances
  • Upgrades to existing primary clarifiers
  • Installation of a SCADA system to monitor and control equipment

Key Facts

Location
Clemson, South Carolina
Client/s
Clemson University
Contractor
Ruby-Collins, Inc.
Project Type
Waste Water Treatment Plant Improvements
Cost
$3,957,729