Scope

This project addressed the need to provide redundancy and additional capacity for the existing 30-inch line that transfers water from the water treatment plant to remote clearwells. Phase 1 of the project consisted of approximately 16,400 feet of 36-inch ductile iron water transmission main including two creek crossings and related appurtenances. Scope of services included:

  • Perform transient surge analysis under various pumping scenarios.
  • Select the final route, conduct public meetings, and assist with private right-of-way acquisition.
  • Prepare construction drawings, technical specifications, and all permitting applications.
  • Provide bidding assistance, construction administration, and construction observation.

 

Key Facts

Location
Easley, South Carolina
Client/s
Easley Combined Utilities
Contractor
Don Moorhead Construction, Inc.
Project Type
Water Supply
Cost
$2,769,000